Running short of concrete in the middle of a pour is the one mistake you cannot fix later: the first part starts to set before the rest arrives. Ordering far too much wastes money. The good news is that the math is short. This article works through a 10 × 10 ft slab, the most common size people ask about, from the first measurement to the order.
Every volume and bag count below comes from our concrete calculator. You can open the 10 × 10 ft example already filled in and change the sizes to yours.
The formula
A slab is a flat box, so its volume is length × width × thickness. Length and width are measured in feet, but thickness is usually given in inches, so divide it by 12 first:
volume (ft³) = length (ft) × width (ft) × thickness (in) ÷ 12
Then turn cubic feet into what you will buy:
- Cubic yards (how ready-mix is sold in the US): divide by 27, because a cubic yard is 3 × 3 × 3 = 27 ft³.
- Bags: divide by the bag's yield. An 80 lb bag of premixed concrete makes about 0.60 ft³, a 60 lb bag 0.45 ft³ and a 40 lb bag 0.30 ft³. Always round bags up.
Measure in feet and turn inches into part of a foot: 10 ft 6 in is 10.5 ft, and 3 inches is 0.25 ft. For an odd shape, split it into rectangles, work out each one and add them.
Worked example: a 10 × 10 ft slab, 4 inches thick
- Volume: 10 × 10 × 4 ÷ 12 = 33.33 ft³.
- In cubic yards: 33.33 ÷ 27 = 1.23 yd³.
- Add 10% extra for spills, uneven ground and forms that bow: 33.33 × 1.10 = 36.67 ft³, which is 1.36 yd³.
- In 80 lb bags: 36.67 ÷ 0.60 = 61.1, so 62 bags. In 60 lb bags, 82; in 40 lb bags, 123.
Without the extra 10%, the same slab needs 56 bags of 80 lb. The 6 extra bags are cheap insurance.
How thick should the slab be?
Thickness changes the order more than people expect, because every extra inch adds a quarter more concrete to a 4-inch slab. The same 10 × 10 ft slab, with 10% extra:
| Thickness | Cubic feet | Cubic yards | 80 lb bags |
|---|---|---|---|
| 4 in | 36.67 | 1.36 | 62 |
| 5 in | 45.83 | 1.70 | 77 |
| 6 in | 55.00 | 2.04 | 92 |
Patios, walkways and shed bases are often poured 4 inches thick. Driveways and slabs that carry a car or heavy equipment are often 5 to 6 inches. Your local building code may set a minimum, so check it before you pour.
How much extra to add
The calculator adds 10% by default. Use 5% for a neat job on firm, level ground with straight forms. Use 10% or more when you mix by hand, when the ground is uneven, or when the dig-out is deeper in some places. Measure the depth at several spots: a slab that is 4½ inches deep on average instead of 4 needs about an eighth more concrete.
Thickened edges and footings
Many slabs are thicker along the edges. Work out the edge as its own strip and add it to the slab. For an edge 12 inches wide that goes 4 inches deeper than the slab, all around the 10 × 10 ft slab:
- The strip is the perimeter, 4 × 10 = 40 ft long, 1 ft wide and 4 inches deep.
- Volume with 10% extra: 40 × 1 × 4 ÷ 12 × 1.10 = 14.67 ft³, or 0.54 yd³: 25 more bags of 80 lb. You can open the edge in the calculator as a long, narrow slab.
- Slab and edge together: 36.67 + 14.67 = 51.33 ft³, which is 1.90 yd³.
Round post holes and piers use the calculator's "Round column or post hole" setting instead: π × radius² × depth.
Bags or a truck?
At 1.36 cubic yards, the 4-inch slab is close to the point where a ready-mix truck makes sense. Sixty-two bags of 80 lb weigh about 4,960 lb, and mixing them takes hours, which is hard to do before the first batch starts to set. Many suppliers deliver smaller loads for an extra fee, so ask for a quote for the exact yardage before you buy pallets of bags. For post holes, steps and repairs, bags are usually the easier choice.
When you call a supplier, give the cubic yards with the extra already included, the thickness and the date of the pour, and ask how long the driver can wait while you unload. Have helpers, a wheelbarrow and the forms ready before the truck arrives.
Don't forget the gravel base
Most slabs sit on a layer of compacted gravel. It is not part of the concrete thickness, so work it out on its own. A 4-inch base under the same 10 × 10 ft slab, with 10% extra, is 1.36 yd³ of gravel: about 3,938 lb, or 1.97 tons of crushed stone at 2,900 lb per cubic yard. Our gravel calculator turns the same sizes into tons and bags.
In metric
In Canada, France and most countries outside the US, ready-mix concrete is sold by the cubic metre, and bags come in kilograms. Use length (m) × width (m) × thickness (cm) ÷ 100. A 3 × 3 m slab 10 cm thick is 0.9 m³; with 10% extra, 0.99 m³, or 85 bags of 25 kg (at about 11.7 litres per bag; check the label of your brand, as yields differ). The same slab at 15 cm needs 1.485 m³. Rules for slab thickness, reinforcement and frost protection are set by local building codes, which differ by country and region.