Home project budget calculator

Plan a renovation, a repair or a DIY job line by line. Add your own sales tax rate and a contingency, see the total against your budget and the cost per square foot or metre, how much to save each month, and two or three contractor quotes side by side.

Home project budget calculator

Your project, line by line

Add each thing you will pay for. Leave the quantity empty for 1.

Line 1

$

Line 2

$

Line 3

$

Line 4

$

Line 5

$

Tax, contingency and budget

%

Your own combined rate (state and local, or GST and PST). Applied only to the lines marked “Add sales tax”.

%

Planning default: 10%, a common allowance for surprises, not an official number. Change it to suit your project.

$

The most you want to spend.

Area in
ft²

For the cost per square foot or square metre.

Saving for it

$

The amount to put aside each month to have the total by then.

Compare contractor quotes

Type each quote’s amounts before tax, as most quotes show tax on its own line. Leave a row empty for 0.

Quote 1

$
$
$
$

Quote 2

$
$
$
$

Quick answers

How much contingency should I add to a renovation budget?

The page starts at 10% of the lines and the tax, a common planning allowance for surprises. It is not an official number: many people set aside 10% to 20%, more when walls or floors will be opened. Type your own percent, or 0 to leave it out.

How do I compare contractor quotes?

Choose 2 or 3 quotes and type each one’s materials, labor, permits and fees, and everything else, before tax. The table puts them next to your own lines, row by row, names the lowest total and shows how far each quote is from your plan.

Was this calculator helpful?

Only yes or no (and the reason you pick) is sent, never your numbers. No account, no cookie. How we count answers

How the home project budget works

Each line is one thing you will pay for: its room or phase, its type of cost, a quantity and a price each. Lines are worked out to the cent, then added. The tax and the contingency are each rounded to the cent too, so the total is exactly the sum of what you see.

Line = quantity × price each

Tax = lines marked taxed × your tax rate ÷ 100

Contingency = (subtotal + tax) × contingency ÷ 100

Total = subtotal + tax + contingency · Per month = (total − saved) ÷ months, rounded up

The contingency is money set aside for what you cannot see yet: rot behind a wall, a pipe that has to move, a price that rises. The page starts at 10%, a common planning allowance, not an official number or a rule. Raise it for an older home or a job that opens walls and floors, or type 0 to leave it out.

Worked example

A bathroom refresh with five lines, a 7% sales tax on the materials and the tool rental, a 10% contingency, a $2,500 budget, a 60 ft² floor, $500 already saved and a date 12 months away.

  1. Lines: 60 tiles × $4.50 = $270.00; a vanity $650.00; 16 hours of labor × $65 = $1,040.00; a permit $150.00; a tool rental $80.00.
  2. Subtotal: $270 + $650 + $1,040 + $150 + $80 = $2,190.00.
  3. Tax on the taxed lines: ($270 + $650 + $80) × 7 ÷ 100 = $1,000 × 0.07 = $70.00.
  4. Contingency: ($2,190 + $70) × 10 ÷ 100 = $226.00.
  5. Total: $2,190 + $70 + $226 = $2,486.00, so $14.00 left in the $2,500 budget.
  6. Per square foot: $2,486 ÷ 60 = $41.43 (per square metre: $2,486 ÷ 5.574 = $445.98).
  7. To save: ($2,486 − $500) ÷ 12 months = $165.50 a month.

Two quotes for the same job: quote 1 is $950 materials, $1,300 labor, $150 permits and $100 for the rest, $2,500 before tax; quote 2 is $1,100, $950 and $150, $2,200. Your own lines come to $2,190 before tax, so quote 2 is the lowest, $10 above your plan, while quote 1 is $310 above it, mostly in labor.

The same bathroom in metric: a 5.6 m² floor gives $2,486 ÷ 5.6 = $443.93 per square metre.

Comparing contractor quotes line by line

Totals alone can hide the difference. Type each quote in the same four rows (materials, labor, permits and fees, and everything else) before tax, as most quotes show tax on its own line. The table sets them next to your own lines grouped the same way, so a quote with cheap materials and expensive labor stands out. The US Federal Trade Commission advises getting several written quotes, not choosing the lowest one automatically, and asking why when one is far from the others.

Sales tax differs by place

No tax rate is assumed here, because it depends on where you live and on what is taxed. Some US states tax the labor on a repair and others only the materials; local rates add to the state rate. In Canada, GST or HST usually applies to a contractor’s services as well as the materials, and the provincial sales tax rules (PST, QST) differ by province. In much of Europe, VAT is already in the price you are quoted. Mark the lines your place taxes, and type your combined rate; the sales tax calculator lists state and provincial rates.

Tips before you start

  • Measure first: the square footage calculator gives the area, and the tile, flooring and paint calculators the quantities to type here.
  • Group by phase when the work is spread over months: “Phase 1”, “Phase 2” and “Phase 3” show what each step costs.
  • Buying a home that needs work? The closing cost calculator shows the cash you need at closing; add the renovation on top.
  • Saving for it? The savings calculator shows how monthly deposits grow with interest.
  • Keep the emergency fund for emergencies. The emergency fund calculator shows how many months of essentials you have saved, so a planned project does not empty it.

Frequently asked questions

How do I budget for a home renovation?

List everything you will pay for, line by line: materials, labor, permits and fees, tools or rental, delivery and design. Add sales tax to the lines your state or province taxes, then a contingency for surprises. A bathroom with $2,190 of lines, 7% tax on $1,000 of them and a 10% contingency comes to $2,190 + $70 + $226 = $2,486.

Is labor taxed on a home project?

It depends on where you live and on the kind of work. Some US states tax labor and services on repairs, others tax only the materials, and in Canada GST or HST usually applies to a contractor’s services too. That is why each line has its own “Add sales tax” box, and you type your own combined rate.

How do I work out the cost per square foot?

Divide the whole total by the area: $2,486 ÷ 60 ft² = $41.43 per square foot. The page uses the total with tax and contingency, so it is what the project really costs per square foot. It also gives the cost per square metre: 60 ft² is 5.574 m², so $445.98 per m².

How much should I save each month for a project?

Take what is still needed (the total minus what you have saved) and divide it by the whole months until your date, rounded up to the cent. $2,486 − $500 = $1,986 over 12 months is $165.50 a month. No interest is added; the savings calculator shows what interest would add.

Should I pick the lowest quote?

Not automatically. The US Federal Trade Commission advises getting several written quotes and asking why when one is far from the others. Check that each quote covers the same work, materials, permits and clean-up before you compare totals.

Sources

Calculations are exact for the numbers you enter. Real costs, tax rules and quotes can change once the work starts. Check what your local sales tax applies to and whether your project needs a permit. Read the full disclaimer and how we check our formulas.